Loading
Loading
Before: The group ran hot. Sales were there. Kitchen leads at each site knew their crew and their clients, but nobody was working off the same definition of a portion, a pull sheet, or a finished tray. Transfers between the main kitchen and satellites lived in texts. When a van showed up late, the receiving site improvised. When improvisation worked, it became the new normal before anyone updated a recipe card. What was broken: Ownership for variance was fuzzy. Food cost was a monthly argument between ops and finance because the underlying counts did not line up with what walked out the door. High performers hid weak sites. Weak sites blamed vendors, weather, or "the big weekend" without a number attached. Training happened, but the floor still rewarded whoever could patch fastest.
We wrote a short non-negotiable list: what gets counted, when, who signs it, and how it hits the sheet. Thaw, pack, dispatch, and return got time stamps people could not fake without someone else noticing. Pars moved off memory. Each site got pull targets from trailing actuals, with a cap on how much could be adjusted without a director sign-off. Waste buckets got a reason code, not a shrug. Managers ran the same Monday review: top five variances, one fix each, date on the calendar. No deck. A whiteboard and the actual tickets.
Food cost stopped swinging on mystery. The worst site stopped dragging the average once everyone could see the same gap in the same week. Daily firefighting on counts dropped to a rhythm people could plan around. New leads did not need six months of tribal knowledge to run a shift that looked like the other sites. That is the shift: from "trust me" to "here is the sheet."